Features:
Material: Nylon
Waist: 70-120cm
Belt Width: 2.5cm
Leash Length: 138-190cm
Application: for Running Walking Hiking
Adjustable waist belt and elastic dog leash
The dog leash extend to 74 inches (from 1.38 to 1.90m)
Reflective strip on waist belt to keep running safe in the night
Hands-free, suitable for running, walking, hiking, etc.
Package Content:
1 x Reflective Waist Belt ;
1 x Elastic Dog Leash .
Please allow 7-20 business days for delivery
NOTE: This is a direct import product. The product will be shipped from overseas
We ship across Australia, including major cities like: Sydney, Melbourne, Perth, Brisbane, Adelaide, Canberra, Newcastle and the Gold Coast
Warranty Policy
Returns Policy
Estimated Delivery Time Frame: 7-20 business days