Online Deals by MyDeal

Enjoy up to $0 off your order by spending your Everyday Rewards dollars

4G Portable GPS Tracker for Kids and Pets � Real-Time Location Monitoring

Image 1
Image 2
Image 3
Image 4
Image 5
Image 6
Image 7
Image 8
Image 9
Image 10
Image 11
Image 12
Image 13
$159

Collect 159 Everyday Rewards points

Log in to MyDeal to link your card
Free Shipping

Dispatch in 2 business days

Sold & shipped by Vimel
Secure ways to pay at checkout
4G Portable GPS Tracker for Kids and Pets

Keep your loved ones safe with the 4G Portable GPS Tracker for Kids and Pets. This compact device offers real-time location tracking, geo-fencing, two-way audio communication, and more�all without the need for a subscription.

Key Features
  • Real-Time GPS Tracking: Monitor the live location of your child, elderly family member, or pet from anywhere using the dedicated mobile app or web portal.
  • Geo-Fencing: Set virtual boundaries and receive instant alerts if the tracker moves outside the designated area.
  • Two-Way Audio Communication: Communicate directly with the wearer through the built-in microphone and speaker, providing reassurance when needed.
  • 4G Connectivity: Utilizes 4G broadband for fast and reliable data transmission, ensuring timely updates and alerts.
  • Multi-Platform Access: Compatible with both Android and iOS devices, allowing for flexible monitoring options.
  • No Subscription Fees: Enjoy all features without the burden of ongoing costs, making it a cost-effective solution for families.
Applications

This versatile GPS tracker is ideal for:

  • Ensuring the safety of children during school commutes and outdoor activities.
  • Monitoring elderly family members with dementia or other health concerns.
  • Tracking pets during walks or outdoor adventures.
Specifications
Feature Details
Dimensions 60mm x 24mm x 21mm
Weight Approximately 50g
Battery Life Up to 72 hours (depending on usage)
Connectivity 4G LTE
Operating Temperature -10�C to 50�C
Water Resistance IP65
What's Included
  • 1 � 4G Portable GPS Tracker
  • 1 � USB Charging Cable
  • 1 � Quick Start Guide

How It Works

Simply insert a 4G-enabled SIM card into the tracker, charge it fully, and pair it with the mobile app. Once set up, you can monitor the device's location in real-time, set geo-fences, and communicate through the two-way audio feature.

Stay connected and ensure the safety of your loved ones with the 4G Portable GPS Tracker for Kids and Pets�a reliable and cost-effective solution for modern families.

SKU: VIM-PET6

Estimated Delivery Time Frame:2-3 business days

Ask a Question About This Product

Reference ID: 15203776

More from this brand

OEM