Online Deals by MyDeal

Enjoy up to $0 off your order by spending your Everyday Rewards dollars

Full Line Quilting Stencil S-Curve A3 size

Image 1
Image 2
Hurry! 3 items left!
$24.95

Collect 24 Everyday Rewards points

Log in to MyDeal to link your card
$9.95 Australia-wide (per-item)

Dispatch in 2 business days

Sold & shipped by Old Mill Quilting
Secure ways to pay at checkout

A feather border that literally winds around your borders! It's 5" from widest point to widest point, ideally fits a 5 1/2" to 6" border. It has a built in corner and registration marks to aid in aligning the repeats. It looks great with tradition patterns as well as contemporary quilts.


FULL LINE QUILTING STENCIL


Full line stencils are unique and designed to match perfectly with a chalk Pounce Pad. These stencils are accurate and are fast and easy to use. Full line stencils are made from a tough nylon mesh however they are light and delicate to use. Only the design on the stencil is open so there won't be any extra chalk residue on your fabric, also there is no "right" or "wrong" side to the stencil so it can be used on both sides. Using the Pounce Pad also helps to reduce hand fatigue as you are not constantly holding a pencil you simply wipe the pad over the stencil for an easy to see line every time. You can also use paint on the stencils without worry as they are waterproof and can simply be rinsed under water when finished. If the stencil gets wrinkled simply iron it flat again!

GTIN: 099238304578

Estimated Delivery Time Frame:3-7 business days

Ask a Question About This Product

Reference ID: 12132558