GPS Tracker Covert Audio with LIVE Listening � 4G Real-Time Location & Voice Recording
,gravity=Center,allowExpansion)
,gravity=Center,allowExpansion)
,gravity=Center,allowExpansion)
,gravity=Center,allowExpansion)
,gravity=Center,allowExpansion)
,gravity=Center,allowExpansion)
Collect 270 Everyday Rewards points
Dispatch in 2 business days
Collect 270 Everyday Rewards points
Dispatch in 2 business days
Experience advanced, discreet monitoring with this Covert GPS Audio Tracker, designed to deliver precise location tracking and real-time audio surveillance in one powerful device. Perfect for professionals, fleet managers, private investigators, and security-conscious individuals, this tracker combines multi-system satellite positioning with 4G connectivity to provide continuous updates and live listening capabilities anywhere, anytime.
Utilizing GPS and BDS dual satellite technology, this device offers exceptional positioning accuracy, while 4G LTE ensures rapid data transmission. The built-in microphone allows for remote live listening and voice recording, making it ideal for covert surveillance or safeguarding valuable assets. Long battery life of up to 75 days standby reduces the need for frequent maintenance, supporting extended deployments.
The tracker features a strong magnetic mount for effortless attachment to any metal surface without tools, enabling quick, Mini installation under vehicles or on equipment. Manage the device easily through a dedicated mobile app or web dashboard to customize tracking intervals, set geo-fences, and receive real-time alerts. OTA updates keep your device optimized remotely without manual intervention.
Specification | Details |
---|---|
Network Support | 4G LTE-FDD Bands: B1 B2 B3 B4 B5 B7 B8 B28 B66 |
SIM Card Type | Micro SIM Card |
Communication | LTE / GSM |
Tracking Technology | GPS + BDS dual satellite positioning, AGPS, LBS, WiFi |
Battery Capacity | 7500mAh Rechargeable Lithium-Ion |
Battery Life | Up to 75 days standby |
Working Voltage | 5V DC |
Operating Temperature | -20�C to +75�C |
Operating Humidity | 10%RH to 85%RH |
Dimensions (L � W � H) | 86mm � 63mm � 34mm |
Weight | 236g |
Compatible with most Australian carriers including Telstra, Optus, Vodafone, Aldi, Belong, Woolworths, TPG, and Amaysim for broad network coverage.
SKU: VIM-GPS106
Estimated Delivery Time Frame:2-3 business days
Ask a Question About This Product
Reference ID: 15203920