Rogz Control Shock Absorbing Bungee Dog Long Lead Pink XL
,gravity=Center,allowExpansion)
Collect 54 Everyday Rewards points
Dispatch in 2 business days
Collect 54 Everyday Rewards points
Dispatch in 2 business days
The Control Lead is designed for strong erratic pullers, absorbing the pull pressure along the surface of the soft bungee webbing which extends and retracts according to your dog's behaviour, minimizing the risk of injury to you or your dog.
Features
• Shock absorbing webbing
• ShocLoc control system
• Reflective stitching
• SnapLoc trigger hook
• Waste bag holder
• Durable nylon
• Soft neoprene handle
Sizes guide
(control lead length) width of webbing size
• M - (1.4m) 16mm
• XL - (0.8m) 25mm
Squizzys Online ships items within 1-2 business days. Squizzys Online tries to ensure that all products are delivered in a prompt and timely manner. However, from time to time, it is possible that shipping and other factors outside of our control may result in delays. Squizzys Online does not accept any liability for loss or damage suffered by anyone as a result of any such delays and we shall not be liable for any inaccuracy of information provided in relation to the date and time of delivery.
Squizzys Online reserves the right not to ship to remote or rural locations. If you are located in a remote or rural area & you place an order we will contact you to try work out a solution for you, we may be able to deliver your parcel to a town near you. If we are unable to find a solution you will be issued with a full refund.
Change of Mind:
Squizzys Online will accept any new and unused purchase returned within 30-days of purchase for a refund or exchange (excluding freight charges) Any goods returned for a refund or exchange must be in the original packaging and in a saleable condition, accompanied by the original invoice number, date of purchase and reason for return.
Please contact us in the event that you're not satisfied with your purchase or service we have provided as we're more than happy to work with you to ensure a positive experience.
All returns are subject to inspection by Squizzys Online and must be returned to the address shown on the invoice at the consumer’s expense for inspection. Any part that, in our opinion, shows evidence of being used or installed contrary to manufacturer's instructions and/or subjected to improper handling, packaging, or shipping by the customer will not be eligible for exchange, refund, or warranty consideration.
No liability will be attached to Squizzys Online for any loss of profits and/or any other loss, damage or expense arising out of any defect from supplied componentry.
Warranty:
If you received a damaged shipment, product and/or faulty item, please send through photos of the damaged item(s) and include your invoice number and name, and we will work with you to resolve the issue.
GTIN: 649510037986
Estimated Delivery Time Frame:4 - 12 business days
Ask a Question About This Product
Reference ID: 13235454