Online Deals by MyDeal

Enjoy up to $0 off your order by spending your Everyday Rewards dollars

Washable Female Pet Dog Cat Nappy Diaper Physiological Pants Panties Underwear Blue

Image 1
Image 2
Image 3
Image 4
Image 5
Image 6
Image 7
Image 8
Image 9
Image 10
Image 11
Best Price in the Last 14 Days
From$11.09
You save 6%Was $11.74

Collect 11 Everyday Rewards points

Log in to MyDeal to link your card
Take 10% Off Purchases Over $40
Exclusive to Aimall Pty. Ltd. products only. Expires 11.59pm 31/08/2025. Excludes Shipping.
Sold & shipped by Aimall Pty. Ltd.
Secure ways to pay at checkout

Presenting our premium Pet Dogs Physiological Pants - a perfect blend of comfort and protection for your female furry friends. Designed meticulously to cater to the needs of dogs during menstruation, these sanitary diaper shorts are made from a soft, breathable, and harmless cotton blended material, ensuring your pet's comfort all day long.

Features:

  • High-Quality Fabric: Crafted with a cotton blended material that is soft, breathable, and harmless to dogs.
  • Stylish and Comfortable: Adds a touch of cuteness to your dogs' appearance while providing the necessary comfort.
  • Menstruation Protection: Offers effective protection to your female dogs during their menstrual cycle, keeping them clean and comfortable.
  • Easy to Wear: Designed for quick and easy wear, ensuring convenience for both the pet and the owner.
  • Frequent Change for Hygiene: Recommended to change every 2-3 hours to maintain hygiene and comfort, aiding in excretion.

Specifications:

  • Material: Cotton Blended
  • Colour: Blue
  • Chest Size: Please refer to the size chart provided in the pictures
  • Operation Manual: Place a sanitary pad inside the dog’s pants for added protection and easy cleaning.

Package Includes:

  • 1 x Dog Physiological Pants (Blue)

Note:

  1. It is advisable to change the sanitary pad regularly to maintain hygiene.
  2. The actual color of the item might slightly differ from the pictures due to variations in monitor and lighting effects.
  3. Please allow a 1-3cm measuring deviation due to manual measurement.

Provide your furry friend with the ultimate care and protection during their menstrual cycle with our Pets Dogs Physiological Pants. Shop now and ensure your pet's comfort and cleanliness!

Estimated Delivery Time Frame:2-10

Ask a Question About This Product

Reference ID: 12342552