Enjoy up to $0 off your order by spending your Everyday Rewards dollars

4k Type C to HDMI Adapter USB C 3.1 Cable 30Hz For MacBook Chromebook

Image 1
Image 2
Image 3
Image 4
Image 5
Image 6
Limited Stock
$17.44

Collect 17 Everyday Rewards points

Log in to MyDeal to link your card
$6.90 Australia-wide

Dispatch in 2 business days

Sold & shipped by One Click Shop
Secure ways to pay at checkout
Pay in 4 interest-free payments of $4.36 with Learn More

4K Type C to HDMI Adapter USB C 3.1 Cable 30Hz For MacBook Chromebook

4K Type C to HDMI Description:

This USB 3.1 4K Type C to HDMI Adapter provides high throughput using the USB 3.1 bus and supports monitors with high resolution and high refresh rate. The USB3.1 Type-C Adapter allows you to connect your desktop PC or laptop's USB3.1 port to an extra monitor or TV with high stability and high audio output.

Specifications:
Standard USB3.1 Type-C
Supports USB 3.1 input and HDMI output
Flexible USB Type-C Switching Support for USB 5G and DisplayPort 1.2 Alt mode
Supports per lane data rates of 5.4 Gbps (HBR2), 2.7 Gbps (HBR) and 1.62 Gbps (RBR)
Supports multiple colour formats: RGB 6/8/10/12-bit per component (bpc) and YCbCr4:4:4, YCbCr4:2:2,8/10/12bpc
Supports HDMI 1.4 and former versions
Supports resolution up to 3840x2160 @30Hz
Supports HDMI audio
Supports bus-powered and self-powered operation
Support the computer operating system: Windows XP / Vista / Windows 7 (32/64 bit) / windows 8 (32/64 bit)

Color: Gray as shown in the picture

Supports resolutions as follows:
4Kx2K@24Hz, 25Hz, 30Hz
1080P@24Hz, 50Hz, 60Hz
720P, 480P,576i, 480i @50Hz and 60Hz

Supported display functions:
1. Mirror
2. Primary
3. Extended
4. Rotate
Synchronous output audio and video to the HDTV, projector, slide projector HD devices and very easy to operate
Length: 14cm

Compatible with:
Nokia N1 tablet, Chromebook Pixel 2015, MSI Gaming Notebooks, 12" Apple MacBook, and other devices with a USB 3.1 Type C port to hdmi

Package Included:
1x 4K Type C to HDMI Adapter

MPN: 4K Type C to HDMI

Estimated Delivery Time Frame:2-7 business days

Ask a Question About This Product

Reference ID: 13561002

Proudly growing a MyDeal Forest

By purchasing from MyDeal, you're helping us plant 8.6 hectares of trees per year with Greenfleet

More from this brand

AllTech

Related Items